Our projects — References

Fornebukollen condominium - charging facility - Electric car wholesaler
Fornebukollen condominium - Charging facilities - Reference - Electric car wholesaler

Fornebukollen condominium — Fornebu

Number: Prepared infrastructure for 33 places
Active charging stations: 10 pcs
Charging system: ZapCharger Pro

The Fornebukollen housing association is located in Fornebu and wanted a solution that was future-oriented, scalable and fair. A separate fence was built in connection with the charging facility for easy installation of infrastructure and charging stations. The infrastructure costs were distributed among all housing units and each section owner can thus easily connect to the existing infrastructure when they want a charging station.


Hammerfestgata 2 - Charging facility - Condominium - Electric car wholesaler

Hammerfestgata housing association — Rodeløkka

Number: Prepared infrastructure for 27 places
Active charging stations: 2 pcs
Charging system: ZapCharger Pro

The housing association is centrally located on Grünerløkka with underground parking and the desired infrastructure for all parking spaces. At the same time, they would distribute the available capacity between everyone so that it is fair. Infrastructure was added to all the car parks. The payment solution has been activated so that each individual pays via bank card/credit card for their consumption.

Hammerfestgata 2 - Charging facility - Housing association - Electric car wholesaler

Jernbaneveien 123 housing association - Charging facility - Electric car wholesaler
Jernbaneveien 123 housing association - Charging facility - Electric car wholesaler

Jernbaneveien 123 housing association — Bærum

Number: Prepared infrastructure for 12 places
Active charging stations: 3 pcs
Charging system: ZapCharger Pro

Jernbaneveien 123 housing association is centrally located in Stabekk and wanted a solution that was future-oriented, scalable and distributed the limiting capacity optimally. Flat cable was installed in all the car parks and the infrastructure cost was distributed among all the homes. It is arranged so that each section owner easily connects to the infrastructure when they wish and pays for the assembly and installation of a charging station for their car park themselves.


Kilehagen condominium - Charging facility - Easee Charge - Reference - Electric car wholesaler
Kilehagen Sameie - Prosjektene Våres - Elbilgrossisten AS

Kilehagen housing association — Ås

Number: Prepared infrastructure for 11 places
Active charging stations: 5 pcs
Charging system: Easee Charge

The Kilehagen housing association in Ås wanted a solution with shared infrastructure that distributed the available capacity optimally between all the garages. Likewise, it was important that the system was future-oriented, scalable and fair. It was important to be able to manage and read power consumption for each individual and Easee Charge's administration panel in the cloud makes this neat and easy.


Mortensrudgrenda - Charging facility - Residential property - Easee Charge - Electric car wholesaler

Mortensrudgrenda housing association — Oslo

Number: Prepared infrastructure for 11 of 13 places
Active charging stations: 9 pcs
Charging system: Easee Charge

Mortensrudgrenda housing association in Søndre Nordstrand wanted a charging system that distributed the available capacity optimally, is future-oriented and scalable. With the desire to have a high charging speed and limited capacity, it was natural to use the Easee Charge charging system. This ensures that everyone gets maximum charging power at all times.

Mortensrudgrenda C11 Garage team - Our projects - Electric car wholesaler

Fredrik Stangs Gate 2 - Charging facility - Easee Charge - Reference - Electric car wholesaler
Fredrik Stangs Gate 2 - Charging facility - Easee - Electric car wholesaler

Fredrik Stangs Gate 2 — Oslo

Number: Prepared infrastructure for 4 out of 20 places
Active charging stations: 4 pcs
Charging system: Easee Charge

Fredrik stangs gate 2 is a residential building with a garage facility below ground level that wanted a robust and solid charging system. It was important to the owner that the charging system distributed the capacity optimally, while at the same time being future-oriented and scalable. With the desire to have maximum charging speed and limited capacity, it was natural to use Easee Charge. This ensures that everyone gets full charging power at all times.